AmpGo

Charging stations in public places

AmpGo provides reliable charging solutions for public car parks, park-and-go and destinations. We help with location, signage, user flow and a plan for expansion.

Planning and dimensioning
Installation
Operation and support
Typical locations
Park-and-gocommuters and hubs
Destinationsculture, sports, tourism
Municipal buildingstown hall, citizen services
Public parkingurban spaces and hotspots

Examples of public installations

Two typical examples, from destination to street level.

Public AC charger with Monta and AmpGo branding
Charging stand in a public square by the road

Typical cases

Destinations

Loading where citizens and tourists keep still, e.g. sports, culture and port.

Park-and-go

Create value for commuters with simple, clear charging and good signage.

Municipal parking spaces

Charging at public buildings and urban spaces, with the possibility of expansion.

This is how you get started

1. Needs and goals
Who will let and what type of location is it?
2. Location and capacity
User flow, signage, cabling and dimensioning.
3. Solution design
Equipment selection, access and operation, with plan for expansion.
4. Installation
Establishment and commissioning.
5. Operation and optimization
Monitoring, support and continuous improvement.

Do you want a concrete plan for your location?

Fill out the form and we’ll get back to you soon.

Get a quote

FAQ: public charging stations

How to start a charge?

You can typically start charging in several ways:

  • Card terminal (DC): Start charging and pay directly by debit card.
  • QR code (AC): Scan the QR code and pay with a payment card (e.g. Visa or Mastercard). It doesn’t require that you download an app or create a user.
  • Charging apps via roaming: In most cases, you can also start charging via your favorite charging app through roaming partners.
  • Monta Charge: As a starting point, all our chargers use Monta Charge (recommended). Download Monta Charge
How do you pay at public charging stations?

You can pay by credit card at all our public charging stations:

You don’t need to download an app or create a user to pay via card terminal or QR code.

  • DC sites: Payment by payment card via card terminal.
  • AC sites: Payment by payment card via QR code (e.g. Visa or Mastercard). The QR code is typically shown as a sticker on the charging stand, or in the charging stand’s display. If there is a display, the QR code will often become visible when you press the display.
Example of card terminal on DC charger

DC: payment via card terminal.

Autel charger with display and QR code for payment

AC: QR code on display (visible when activating the display).

Can we start small and expand later?

Yes. We dimension the solution and location so that expansion is simple.

Who is responsible for operation and support?

It depends on the model. AmpGo can take responsibility for operation and support via agreement.

Should charging be public or restricted?

As a starting point in public places, the charging stations will be accessible to everyone.

In most cases, we can also make them available in different charging apps and maps, so drivers can start charging from their preferred charging app via roaming partners.

If you want charging to be limited to the public only (or during special periods), we take the dialogue case-by-case and find the right access model.

Should we choose AC (11/22 kW) or DC for public spaces?

A good rule of thumb is: If the cars typically last 3 hours or more, will one AC solution (11/22 kW) often be the best match. If the stay is typical under 3 hours, will one DC solution usually provide a better user experience because you get more power in less time.

We help you choose the right combination based on location, user flow and capacity.

How much current (A) does AC and DC require? (thumb examples)

It depends on the installation and available capacity, but as a rule of thumb (3-phase 400V):

  • AC 11 kW: approx. 16A
  • AC 22 kW: approx. 32A
  • DC 50 kW: approx. 80A
  • DC 150 kW: approx. 250A
  • DC 300 kW: approx. 500A

For DC, the real requirements can vary (power factor/efficiency and grid connection), so we always do a capacity check before final dimensioning.

How to find receipt?

If you have started charging in Monta Charge, you can find the receipt in the app below “Me” → “Charge History”.

If you have not used Monta Charge to start charging, you can typically find the receipt here:

https://hub.monta.app/public/receipts