AmpGo

DC fast charging

When you need fast charging with high uptime. AmpGo provides DC solutions for destinations, fleets and traffic hubs, incl. dimensioning, installation and operation.

  • Dimensioning
  • Installation
  • Operation and support

Scalable DC solutions from 50 kW to 1.2 MW

We provide DC solutions that can be scaled from 50 kW and right up to 1.2 MW (1200 kW). Start at an appropriate level and expand as the need increases.

All-in-one chargers

A compact solution where the charging hardware and outlet are combined in one unit. Good when you want a simple installation and a clear setup.

Power cabinet + satellite

A solution where the charging hardware is in power cabinets, and the driver has a satellite unit with a charging outlet. Good when you want to separate the hardware and user point and build a larger system.

For those of you who want to attract more stops

DC fast charging provides shorter charging times and can increase throughput at locations with many visitors. We help you choose the right effect and setup.

  • Capacity: assessment of needs and future expansion
  • Location: logistics, signage and user flow
  • Uptime: operation and monitoring
DC fast charging facility

DC plants can be scaled as needed.

When does DC fast charging make sense?

DC fast charging makes sense when vehicles need to move quickly and where ordinary AC charging is not enough.

This can be the case, for example, with company cars, service cars or other vehicles that only stand still for a short time before they have to go out on the road again. It can also be relevant in locations with high throughput, where users do not have time to charge for a long time.

What do you get out of DC charging?

  • faster charging and shorter charging time
  • possibility to charge several vehicles during the day
  • better operation for fleets and commercial vehicles that need to move quickly
  • possibility of charging larger vehicles such as electric trucks and electric buses
  • a scalable solution that can be expanded as needed
  • an integrated solution where dimensioning, installation and operation are adapted to your company

DC for businesses, fleets and traffic hubs

We help companies and locations set up DC charging points where fast charging must work in practice and suit daily operations.

This could be, for example, with hauliers, waste disposal companies, municipalities or other companies where the vehicles need to move quickly and where stable operation and the right capacity are essential.

DC fast charging

DC fast charging for destinations and fleets.

Limited network capacity does not have to stop the project

If you have limited grid connection, a battery-integrated DC solution can be a way to get started without waiting for major grid expansion.

It may be relevant if the delivery time for extra capacity is long, the local power grid is under pressure, or if you want to establish fast charging now and not in several years.

See our case about DC lightning charging with low mains connection

FAQ: DC fast charging

Can we start with a few charging points and expand later?

Yes, you can. We can ensure that the solution is prepared from the start for later expansion, so you don’t lock yourself in.

This may include preparing the infrastructure so that a larger charger or more chargers can be installed later. We also have solutions where you can add more modules to the charger itself and thus increase the kW output for the vehicle.

What if we don’t have enough free amps around the clock for full effect on the chargers?

This is a classic challenge in DC projects. In some cases, this requires additional network capacity, but other projects can be solved with battery-integrated solutions, load management or a phased expansion.

We help to assess what makes the most sense at your location, so that the charging suits operations, finances and the capacity you actually have available.

Should we choose charging for company cars, guests or heavy transport?

It depends on the usage pattern. Some need fast charging for vans and service vehicles, others for guests, destinations or heavier vehicles such as trucks and buses.

We help to choose the right effect, location and setup based on who needs to charge, how long they stay still and how fast they need to move on.

What does the installation require?

It depends, among other things, on the desired charging effect, location, grid connection, excavation work and the overall installation. Therefore, we typically start with a concrete assessment of the location and the need.

Can you help with access, payment and management?

Yes. If the solution is to be used by employees, guests, customers or public users, we can help with access management, payment and the practical set-up around the operation.

Can AmpGo be responsible for operation and support?

Yes. We can help with both dimensioning, installation and the subsequent operation, so that you are not alone with service, monitoring and support in everyday life.

Can the solution be used for vans, trucks or buses?

Yes. DC solutions can be adapted to everything from passenger cars and vans to heavier vehicles such as trucks and buses. The crucial thing is to choose the right effect, location and capacity from the start.

From idea to operation

We help you all the way from the first sketch to a DC plant that works in everyday life.

1. Need
Location, user flow, effect
2. Design
Location, electricity, network, foundation
3. Installation
Assembly, testing, commissioning
4. Operation
Monitoring, support, service
5. Scaling
Expand as the need grows